    • Details about iP grading are here.
    • Note that the progress shown here is just a rough guidance as it was generated by an automated script. A human inspection will be done after the final submission to confirm the script's findings.
    • If an increment you did does not appear as 'done' in this page, make sure you have pushed the corresponding tag to your fork and the tag matches the increment name exactly. You can even tag past commits if you forgot to tag those commits earlier or the tag you used differs from the expected tag. The increment will be marked as 'done' at the next script run (it runs once per week).
    • Meaning of colors/icons:
      • : you can click on this icon to find more info
      • ABC : you have done the corresponding item.
      • ABC : you have done the corresponding item which is an optional item (well done!).
      • ABC : item overdue, not done yet.
      • ABC : item due soon, not done yet.
      • ABC : optional item due soon, not done yet.
    • If you have queries about the data shown in this page, please email cs2113@comp.nus.edu.sg.

    [This page was last updated on Oct 06 2020]

    Student number (partial)Student i.e., weeks in which some code was committed to the repoWeekly progress i.e., iP increments as indicated by the git tags in your forkIncrements i.e., other iP-related admin tasksAdmin tasks
    A0164814_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0167998_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0177850_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0180311_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0183651_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0184147_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0184531_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0185876_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0188094_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0188204_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0188398_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0189750_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0189855_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0194513_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0194557_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0197788_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199756_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199855_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200226_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200241_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200262_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200273_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200401_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200413_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200476_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200488_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200696_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0201520_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0201538_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0201712_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0201756_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0201815_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0202021_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0202130_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0202359_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0202616_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0205157_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0205636_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0206203_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0206367_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0210346_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0224774_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0224785_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0224786_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0224787_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0226423_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0226494_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0226498_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0226499_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0226781_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0226782_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0226787_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0226788_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0226795_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0226858_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0226866_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0226868_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0227201_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0227335_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0148048_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0149266_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0149286_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0150039_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0152218_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0152225_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0177388_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0180048_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0182344_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0183205_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0188670_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0194492_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0194495_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0194498_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0194508_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0194527_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0194546_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0194548_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0194560_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0194570_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0196507_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0196575_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0196627_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0196669_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0196708_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0197080_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0197142_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0197282_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0197285_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199272_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199277_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199292_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199313_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199331_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199334_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199371_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199409_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199469_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199472_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199500_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199514_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199517_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199555_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199564_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199661_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199673_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199695_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199705_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199757_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199793_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199798_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199845_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199891_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199947_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0199986_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200000_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200043_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200053_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200065_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200198_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200215_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200225_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200234_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200245_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200301_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200321_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200467_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200482_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200549_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200563_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200572_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200574_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200577_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200658_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200659_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200664_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200667_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200697_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200707_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200709_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200769_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200810_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200816_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200825_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200841_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200847_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0200869_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0201175_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0201438_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0201511_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0201527_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0201642_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0201657_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0201661_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0201663_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0201689_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0201708_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0201743_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0201744_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0201851_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0201999_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0202079_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0202134_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0202215_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0202310_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0202552_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0202556_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0204685_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0204690_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0204706_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0204716_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0204811_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0204882_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0204984_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0205021_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0205062_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0205070_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0205132_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0205147_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0205160_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0205174_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0205199_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0205294_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0205301_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0205345_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0205403_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0205410_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0205442_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0205444_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0205490_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0205507_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0205629_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0205726_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0205782_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0205927_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0205948_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0206037_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0206048_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0206056_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0206065_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0206128_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0206134_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0206162_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0206179_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0206226_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0206238_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0206391_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0206416_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0206423_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0206433_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0206438_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0208043_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0210629_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0210750_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0210927_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0211551_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0211622_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0211624_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-CodeQualityLevel-5A-ExceptionsLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar
    A0211781_ 34567 Level-1Level-2Level-3A-CodingStandardLevel-4A-TextUiTestingA-CodeQualityLevel-5A-ExceptionsA-PackagesLevel-6Level-7A-JarA-CollectionsA-MoreOOPLevel-8Level-9A-JavaDocA-UserGuide ForkingPR Creationbranch-Level-5Week 6 Jarbranch-Level-6branch-Level-7branch-A-JavaDocbranch-Level-9Merging PRsPublished UGFinal Jar

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Did not push any commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 1 commit
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 8 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard not found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality not found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections not found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide not found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 3 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 25 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard not found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar not found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections not found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP not found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc not found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide not found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? No
    • PR Creation: Have not created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 not found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 not found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 not found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 24 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 18 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 10 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 10 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 30 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 1 commit
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Did not push any commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 4 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality not found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections not found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP not found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc not found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide not found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 not found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 not found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 11 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 5 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 13 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 27 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Did not push any commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 15 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 5 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 10 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 8 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 8 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 12 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 7 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 2 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Did not push any commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Did not push any commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality not found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 not found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar not found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP not found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 not found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc not found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide not found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 not found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: not done
    • Published UG: Updated User Guide not available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 1 commit
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 2 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 1 commit
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 4 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality not found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections not found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP not found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc not found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 not found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: not done
    • Published UG: Updated User Guide not available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 7 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 4 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 27 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 1 commit
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 1 commit
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 5 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? No
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 not found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 5 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 8 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 16 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 2 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 13 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 9 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 7 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 1 commit

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide not found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 not found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 3 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 9 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 25 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 7 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 7 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 8 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 3 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 18 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 24 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 14 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 13 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 26 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 1 commit
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 7 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 20 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 8 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 9 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 100 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 7 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 20 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 3 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 12 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 31 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 2 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 9 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 14 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 7 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 10 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 27 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 8 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 12 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 3 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 15 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 29 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 15 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 11 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 7 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 29 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 54 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 2 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 2 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 7 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard not found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality not found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections not found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 not found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: not done
    • Published UG: Updated User Guide not available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 4 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 13 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 3 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 7 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 18 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 8 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 8 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 10 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 10 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 62 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 5 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 9 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Did not push any commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP not found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide not available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 8 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 22 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 1 commit
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 9 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 4 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 10 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: not done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 1 commit
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 9 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 5 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 3 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 9 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Did not push any commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Did not push any commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 24 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 8 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 17 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 5 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 23 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 10 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 11 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 12 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 24 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 10 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 13 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 29 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 1 commit
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 1 commit

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 not found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 not found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 not found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard not found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 not found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality not found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 not found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 not found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 not found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar not found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections not found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP not found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 not found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc not found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide not found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 not found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: not done
    • Published UG: Updated User Guide not available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 10 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 7 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 20 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 3 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 3 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 4 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 7 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections not found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 not found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 not found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 not found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: not done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 9 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 8 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 2 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 14 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 20 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 5 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 8 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Did not push any commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 7 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 8 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 20 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 11 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 12 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 14 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 10 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 53 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 6 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Did not push any commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 8 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections not found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide not found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? No
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 not found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide not available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 10 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 7 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 1 commit
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 3 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Did not push any commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections not found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 not found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 not found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 not found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: not done
    • Published UG: Updated User Guide not available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 7 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 5 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 4 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 4 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 not found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 not found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc not found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide not found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 not found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 not found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 not found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: not done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 11 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 6 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 8 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 11 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 37 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 1 commit
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 9 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 2 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 3 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard not found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 not found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 not found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: not done
    • Published UG: Updated User Guide not available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 6 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 3 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 2 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 4 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality not found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar not found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections not found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 not found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 not found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 not found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 not found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: not done
    • Published UG: Updated User Guide not available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 8 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 12 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar not found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections not found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 1 commit
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 1 commit
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 1 commit

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 not found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 not found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 not found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 not found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: not done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 17 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide not found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 not found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 not found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 9 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 9 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 7 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 9 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 8 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 3 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 3 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 11 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide not found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 9 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 8 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 21 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 24 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 82 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 10 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 8 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 13 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 11 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 21 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 10 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 10 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 10 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 3 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 19 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 1 commit
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 9 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 7 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 7 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Did not push any commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP not found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 9 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 18 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 7 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 2 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 13 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 not found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc not found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 not found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 not found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 8 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 3 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 9 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 9 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? No
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide not available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 11 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 9 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 4 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 13 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 7 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 13 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 5 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 22 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 3 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 2 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 8 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 15 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 not found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 not found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 not found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: not done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 7 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 21 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 10 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Did not push any commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 9 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 20 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 3 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 7 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 19 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide not available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 14 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 8 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 9 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 23 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 7 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 5 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 3 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 8 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard not found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections not found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 not found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 not found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 not found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 not found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: not done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 3 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Did not push any commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Did not push any commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 not found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 not found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 not found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard not found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 not found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality not found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 not found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 not found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 not found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar not found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections not found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP not found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 not found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc not found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide not found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: not done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 1 commit
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 8 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 17 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard not found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality not found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar not found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections not found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc not found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide not found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 5 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 14 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 29 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 11 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 8 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 17 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard not found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality not found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide not available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 20 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc not found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 not found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 10 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 6 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard not found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide not found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 7 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 7 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 9 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 25 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 8 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 15 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 35 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 3 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 7 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 14 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 3 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 19 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 11 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 9 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 51 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 1 commit
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 3 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 15 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 8 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 13 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 6 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 8 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 11 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 32 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 7 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 7 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 11 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 19 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 55 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 7 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 3 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 12 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 13 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 not found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 10 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 8 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 11 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 47 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 13 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 7 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 53 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 7 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 7 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 14 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 7 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 21 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 2 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 4 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 17 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 4 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 4 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 7 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 30 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 8 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 14 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 6 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard not found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality not found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections not found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide not found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 not found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 1 commit
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 5 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 16 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 8 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 12 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 19 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 7 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 2 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 8 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 5 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 4 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 16 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard not found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections not found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 not found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: not done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 3 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 3 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 6 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 11 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 10 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 27 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 3 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 5 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 4 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 15 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard not found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality not found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 1 commit
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 9 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 10 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 14 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 not found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 8 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 13 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 7 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 9 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 18 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 1 commit
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 7 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 19 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 2 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 10 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 8 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 3 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 25 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 6 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 8 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 23 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 7 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 10 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 9 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 15 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 35 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 11 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 11 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 45 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard not found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 10 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 2 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 3 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 15 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar not found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections not found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 not found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 not found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 not found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: not done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 7 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 10 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 10 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 13 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 45 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 3 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 25 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard not found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections not found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide not available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Did not push any commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 3 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 4 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 9 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality not found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections not found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 not found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 not found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 10 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 15 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 9 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 7 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 16 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 17 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 11 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 8 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 11 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 12 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 36 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 11 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 42 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 9 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 7 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 20 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 7 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 5 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 22 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 2 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 13 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc not found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 7 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 7 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 7 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 2 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 9 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 8 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 26 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 39 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 7 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 31 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 3 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 20 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality not found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 8 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 8 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 39 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 8 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 15 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 3 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 30 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 7 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 11 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 7 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 8 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 13 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 8 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 16 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 7 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 1 commit
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 7 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 39 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 8 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 8 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 7 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 58 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 3 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 7 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 15 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 9 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 13 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 3 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 7 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 22 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 4 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 19 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 13 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 21 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 12 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 6 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 5 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 25 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Did not push any commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 10 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 15 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 16 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 7 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 8 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 29 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 12 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 7 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 15 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 23 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 51 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc not found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 6 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 5 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 18 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections not found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 11 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 7 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 28 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 5 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 33 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 8 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 18 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 not found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 2 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 8 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 15 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 9 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 14 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 19 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 50 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 7 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 20 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 10 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 42 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 7 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 27 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 5 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 20 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 12 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 8 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 10 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 70 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 9 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 3 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 18 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 9 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 13 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 8 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 25 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 10 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 11 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 11 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 17 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 3 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 2 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Did not push any commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 21 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide not found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 not found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 8 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 13 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 29 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 11 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 12 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 3 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 8 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 8 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 10 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 8 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 11 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 31 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 7 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 4 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 17 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 9 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 9 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 30 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 7 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 19 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 2 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 26 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 7 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 30 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 10 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Did not push any commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 13 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 18 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 not found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide not found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 8 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 14 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 17 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide not available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 7 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 22 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 7 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 20 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 5 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 12 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 12 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 5 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 30 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 11 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 8 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 9 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 27 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 12 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 12 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 16 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 11 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 54 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 6 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 19 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 not found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 not found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 not found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide not available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 1 commit
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 7 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Did not push any commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 21 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 7 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 4 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 27 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 22 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 3 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 5 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 4 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 16 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 1 commit
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 5 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 7 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 13 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 2 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 31 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 9 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 7 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 11 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 74 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 9 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 9 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 9 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 10 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 60 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 1 commit
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 3 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 12 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 7 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 2 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 14 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 40 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: not done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 2 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 6 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 4 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 9 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar not found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections not found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 not found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc not found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide not found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 not found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: not done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was not released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 10 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 9 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 21 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 12 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 5 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 4 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 35 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 1 commit
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Did not push any commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 2 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 21 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 15 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 8 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 14 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 10 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 57 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 3 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 17 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 7 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 7 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 26 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 8 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 38 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Did not push any commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Did not push any commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 7 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard not found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality not found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections not found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide not found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 not found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 not found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 11 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 2 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 23 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 not found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 8 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 3 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 7 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 15 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 8 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 11 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 34 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 2 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 15 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 not found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 9 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 10 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 9 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 22 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 1 commit
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 30 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide not found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 8 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 30 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 9 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 44 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard not found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 6 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 9 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 18 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 6 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 8 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 12 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 62 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 5 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 8 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 9 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 33 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Did not push any commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 6 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 2 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 2 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 7 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 12 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 12 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 30 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections not found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 8 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 2 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Did not push any commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 20 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality not found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar not found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 not found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 not found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 not found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc not found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 2 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 6 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 5 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 2 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 12 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 2 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 3 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 12 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections not found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide not found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 2 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 5 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 6 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 18 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 3 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 7 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 32 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 6 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 1 commit
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 4 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 5 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 15 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 5 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 9 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 2 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 1 commit
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 21 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions not found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections not found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 not found in the fork
    • Week 6 Jar: The JAR file was not released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip
    • Final Jar: The JAR file was released via GitHub releases in the period 2020-09-19 00:00:01+08:00 to 2020-10-07 00:00:00+08:00

    iP Weekly Progress

    • Week 3 [Aug 14 2020 - Aug 27 2020]: Pushed 4 commits
    • Week 4 [Aug 28 2020 - Sep 03 2020]: Pushed 4 commits
    • Week 5 [Sep 04 2020 - Sep 10 2020]: Pushed 7 commits
    • Week 6 [Sep 11 2020 - Sep 17 2020]: Pushed 9 commits
    • Week 7 [Sep 18 2020 - Oct 01 2020]: Pushed 15 commits

    iP Increments

    • Level-1: [Due in Week 3]: Tag Level-1 found in the fork
    • Level-2: [Due in Week 3]: Tag Level-2 found in the fork
    • Level-3: [Due in Week 3]: Tag Level-3 found in the fork
    • A-CodingStandard: [Due in Week 3]: Tag A-CodingStandard found in the fork
    • Level-4: [Due in Week 4]: Tag Level-4 found in the fork
    • A-TextUiTesting: [Due in Week 4]: Tag A-TextUiTesting found in the fork
    • A-CodeQuality: [Due in Week 4]: Tag A-CodeQuality found in the fork
    • Level-5: [Due in Week 5]: Tag Level-5 found in the fork
    • A-Exceptions: [Due in Week 5]: Tag A-Exceptions found in the fork
    • A-Packages: [Due in Week 5]: Tag A-Packages found in the fork
    • Level-6: [Due in Week 6]: Tag Level-6 found in the fork
    • Level-7: [Due in Week 6]: Tag Level-7 found in the fork
    • A-Jar: [Due in Week 6]: Tag A-Jar found in the fork
    • A-Collections: [Due in Week 6]: Tag A-Collections found in the fork
    • A-MoreOOP: [Due in Week 7]: Tag A-MoreOOP found in the fork
    • Level-8: [Due in Week 7]: Tag Level-8 found in the fork
    • Level-9: [Due in Week 7]: Tag Level-9 found in the fork
    • A-JavaDoc: [Due in Week 7]: Tag A-JavaDoc found in the fork
    • A-UserGuide: [Due in Week 7]: Tag A-UserGuide found in the fork

    iP Admin Tasks

    • Forking: Forked? Yes. Issue tracker enabled? Yes
    • PR Creation: Created a PR from own fork to upstream repo
    • branch-Level-5: A merged branch named branch-Level-5 found in the fork
    • Week 6 Jar: The JAR file was released via GitHub releases in the period 2020-09-01 00:00:00+08:00 to 2020-09-19 00:00:00+08:00
    • branch-Level-6: A merged branch named branch-Level-6 found in the fork
    • branch-Level-7: A merged branch named branch-Level-7 found in the fork
    • branch-A-JavaDoc: A merged branch named branch-A-JavaDoc found in the fork
    • branch-Level-9: A merged branch named branch-Level-9 found in the fork
    • Merging PRs: At least 1 PR(s) merged in own fork: done
    • Published UG: Updated User Guide available at https://[github_username].github.io/ip